Back to the discussion

in Destinations › Asie du Sud-Est

L'avancée des travaux à l'aéroport de Bangkok?

Discussion started by Genevois on 2010-07-21

3 replies

English translation pending — showing the original.


L'avancée des travaux à l'aéroport de Bangkok?

Genevois · 2010-07-21

Quelqu'un peut confirmer ou donner une info sur l'avancée des travaux ?

Laurent

L'avancée des travaux à l'aéroport de Bangkok?

Assimil · 2010-07-21

Les travaux de l'airport link sont terminés depuis 2009, les tests sont en cours depuis fin 2009 et l'ouverture commerciale est prévue pour le 23 aout 2010

voir l'article du bkkpost du 29/06/2010

The Airport Link train connecting Bangkok and Suvarnabhumi airport will go in operation for commercial service from Aug 23, Transport Minister Sohpon Zarum said on Tuesday. Mr Sohpon said the date was settled after a consultation with the State Railway of Thailand. The Airport Link will offer two types of service on parallel rails - the City Line which stops at every station to transport passengers from Phaya Thai to Suvarnabhumi airport and the non-stop Airport Express which runs from Makkasan to the airport. The fare for the City Line starts from 15 baht and the Airport Express 100 baht per trip. Check-in service is expected to begin in October, Mr Sohpon said.

http://www.bangkokpost.com/breakingnews/184091/airport-link-in-service-from-aug-23

L'avancée des travaux à l'aéroport de Bangkok?

Akyrion · 2010-07-21

Je viens tout juste de lire une info dans la presse touristique asiatique de ce jour à ce sujet !

Bangkok's airport express rail to open on August 23

Sirima Eamtako, Bangkok (2010-07-21)

THE SUVARNABHUMI Airport Rail Link will open for commercial operation on August 23, connecting commuters between the airport and the City Air Terminal at Makkasan Station in Bangkok city centre, where flight and luggage check-in services will be available.

The link will operate daily from 0600 to 0100 with two train systems, each departing every 15 minutes. Travelling time on the Express Line will take 15 minutes while on the City Line will be less than 30 minutes.

The fare structure is not available at press time.

L'avancée des travaux à l'aéroport de Bangkok?

Genevois · 2010-07-21

Et ben ... quelle rapidité, avec les tarifs et tout ...

Bravo et merci !

VoyageForum — the largest community of French-speaking travellers.