Hoangnam49, l'architecte s'appelle
Murphy/Jahn Architects
il a fait le centre de l'aéroport de
munich,
shangai etc..
La vidéo de promotion du nouevl aéroport :
www.bangkokairportonline.com/node/32
www.bangkokairportonline.com/node/26
photo gallery :
www.bangkokairportonline.com/node/15
Erika.
Official nameSuvarnabhumi Airport. The name
Suvarnabhumi was chosen by HM King Bhumibol Adulyadej which means "The Golden Land", specifically referring to the continental Indochina. "Golden Peninsula"or "Golden Land" is a traditional name for the
Thailand-
Cambodia-
Laos-Burma region
How is it pronounced"su-wan-na-poom"
Airport CodeSuvarnabhumi Airport will inherit its IATA airport code
BKK from
Bangkok Don Muang International Airport.
LocationThe airport is located in Racha Thewa in the Bang Phli district of
Samut Prakan province, 30 kilometers east of
Bangkok.
ArchitectsThe airport was designed by
Murphy/Jahn Architects
CapacityThe airport has 2 parallel runways (60 m. wide, 4, 000 m. and 3700 m. long) and 2 parallel taxiways to accommodate simultaneous departures and arrivals. It has a total of 120 parking bays (51 with contact gates and 69 remote gates) and 5 of these are capable of accommodating the Airbus A380 aircraft. With a capacity of handling 76 flight operations per hour, both international and domestic flights will share the airport terminal but will be assigned to different parts of the concourse. In the initial phase of construction, it will be capable of handling 45 million passengers and 3 million tonnes of cargo per year. Between the airport hotel and the terminal building are the two 5-storey car park buildings with a combined capacity of 5, 000 cars.
Airport HotelAbove the underground rail link station and in front of the passenger terminal building is the 600-room hotel operated by Accor Group under the Novotel brand.
Long-term plansLong-term plans for four runways flanking two main terminals and two satellite buildings with a combined capacity capable of handling up to 100 million passengers and 6.4 million tonnes of cargo a year are on the drawing board. The second phase of airport expansion involving the construction of a satellite building south of the main terminal is expected to begin 3 to 5 years after the completion of the first main terminal.